What It Costs, and How Long It Takes

Of the thirteen Canadian commercial audit firms we reviewed in October 2026, one published budget bands and twelve published nothing at all. Price opacity is the main reason building owners do not enquire. So: here is what drives the fee, what the schedule really looks like, and what we need from you before the clock starts.

Why nobody publishes a price, and what we will say instead

An honest answer to "what does an audit cost" is a range, because the work genuinely varies by an order of magnitude between a 15,000 square foot retail unit and a 400,000 square foot hospital with a central plant. Firms resolve that by publishing nothing. We would rather publish the drivers, so you can place your own building inside them before you pick up the phone.

We quote a fixed fee, in writing, after a scoping conversation. Not an hourly rate, not a fee range that firms up later. If the scope changes, we tell you before the work changes.

The five things that move the fee

Fee drivers, in rough order of impact
DriverEffect
1. ASHRAE levelThe largest single factor. Level 2 is typically several times a Level 1; Level 3 adds field measurement, logging and a calibrated model on top of a Level 2.
2. Systems complexityA single rooftop unit and a central chiller plant with a building automation system are not comparable work. Process load, steam, refrigeration and multiple air systems each add scope.
3. Data availabilityThe driver owners consistently underestimate. Complete utility data, a floor area schedule, drawings and an equipment list can take a meaningful share off the fee. Reconstructing utility history across tenant accounts adds to it.
4. Floor area and number of buildingsNot linear. A portfolio of similar buildings costs much less per building than one-offs, because the method and the baseline approach are reused.
5. Programme documentationWriting to a specific programme's required outline and preparing the application is real work. Tell us the programme up front and it is cheaper than retrofitting the report later.
The number that actually matters

Ask for the fee net of funding. Enbridge Gas funds up to 50% of a commercial energy study, to $10,000 commercial or $20,000 institutional, where the building burns at least 100,000 m³ of gas a year. IESO's XLerate cost-shares project feasibility studies at 50%. On an eligible building, the net cost of a study can be half the quoted fee or less — and that is a different capital conversation. Both require pre-approval before the work starts. How that works.

The real timeline

Two firms in this market publish timelines, and they are measuring completely different things — one quotes 9 to 13 weeks end to end, another quotes a three-business-day assessment. Both can be true; they are not the same scope. Here is ours, with the part most schedules forget included.

End-to-end schedule, Level 2 with incentive pre-approval
StageTypical durationWho holds it
Scoping and fixed-fee proposal2–5 business daysUs
Incentive pre-approval, where required4–6 weeksThe programme administrator
Data collection and utility history1–3 weeksYou, mostly — this is the usual bottleneck
Site survey1–3 days on siteUs
Logging, where the level requires it2–4 weeks running in backgroundUs
Analysis and reporting2–4 weeksUs
Review meeting and final issue1 weekBoth

Level 1: roughly 2 to 4 weeks from data availability. Level 2: 4 to 8 weeks. Level 3: 8 to 16 weeks. Add the pre-approval stage in front of all three where a programme requires it.

If you have a deadline, start earlier than feels necessary

The two stages we do not control — programme pre-approval and your utility's data turnaround — sit at the front. An owner who starts eight weeks before a filing deadline has usually already lost the incentive route, even though the audit itself would have fitted.

What we need from you

Having these ready is the cheapest thing you can do to reduce both the fee and the duration.

  • 24 to 36 months of utility data — every fuel, every meter. Utility-supplied data in a spreadsheet is far better than scanned bills.
  • Floor area — a schedule or plan, with the measurement basis. Gross floor area is the most commonly miscalculated figure in this entire field.
  • Major equipment list — make, model, capacity and age where known. "We don't know" is an acceptable answer; we will survey it.
  • Building automation system access or trend exports, if one exists. This is often where the fastest savings are hiding.
  • Operating hours and occupancy, including anything seasonal or unusual.
  • Drawings if you have them — mechanical and architectural. Old drawings are still useful.
  • A site contact who can get us into mechanical and electrical rooms without a week's notice.
  • Any previous audit or study. Send it. It makes the new work cheaper, not redundant.

What makes a project cost more

  • Tenant-metered load with no aggregation in place, so whole-building consumption has to be assembled account by account.
  • No drawings and no equipment list on a complex central plant.
  • Restricted access — occupied healthcare, secure facilities, or survey work confined to nights and weekends.
  • Process load that needs separating from building load before anything can be benchmarked.
  • Multiple programmes with different report outlines on the same building.

Common questions

Will you give a price over the phone?

We will give you a bracket on the phone once we know the level, the floor area, the systems and the data position — and a fixed figure in writing shortly after. What we will not do is quote before knowing those four things, because the number would be meaningless.

Is a free audit worth taking?

Sometimes, and you should know how it is paid for. Utilities fund some walk-through assessments directly, which is genuinely free to you. A contractor offering a free audit is recovering the cost on the work it recommends — see why we sell no equipment.

Can you phase the cost?

Yes, and for portfolios we usually recommend it: Level 1 across all buildings first to find where the opportunity concentrates, then Level 2 only on the buildings that justify it. Auditing twenty buildings to Level 2 when three hold most of the saving is a waste of your money.

Related

Where to go next

Request a proposal

Tell us what is driving the decision

A compliance deadline, an incentive application, a financing requirement, or a capital plan. Tell us which, and we will tell you what you need and what it will cost — as a fixed fee, before any work starts.

If you do not need an audit, we will say so.