Offices are the best-benchmarked building type in Canada and the one where the gap between a good building and an average one is most visible, because ENERGY STAR scores offices and the whole market can see the number. They are also the type where occupancy has changed most since 2020, and where plant is still running for a building that no longer exists.
| Item | Relevance |
|---|---|
| Ontario EWRB and City of Toronto reporting | At 50,000 sq ft; Toronto drops to 10,000 sq ft starting 2027 per the City's page. Two deadlines, one Portfolio Manager account. |
| ENERGY STAR certification | Offices are an eligible type. Score of 75 or higher, Licensed Professional sign-off. Detail. |
| IESO EBCx | Strong fit. Most office findings are sequence and schedule corrections — exactly what this programme funds. |
| IESO Peak Performance Program | Commercial and institutional HVAC load reduction at peak. |
| BOMA Enspire / deep retrofit | Aimed at Class B and C buildings. Detail. |
Ask for one thing before you commission anything: a plot of your building's consumption across a full week, hour by hour. If the overnight and weekend floor is a large fraction of the weekday peak, you are heating, cooling and ventilating an empty building, and the fix is usually settings rather than equipment. It is the cheapest diagnostic in this sector and it is free if you have interval data.
Office landlords are required to report whole-building consumption while controlling only part of it. Where tenants hold their own accounts, whole-building data has to be assembled through utility aggregation, tenant consent, or lease provisions requiring data sharing. The practical answer is to fix the lease at renewal and aggregate in the meantime — and to stop treating the reporting obligation as a data problem to be solved each June. See EWRB reporting.